Heidenhain iTNC 530 (340 420) User Manual Page 392

  • Download
  • Add to my manuals
  • Print
  • Page
    / 530
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 391
364 9 Programming: Subprograms and Program Section Repeats
9.3 Program Section Repeats
9.3 Program Section Repeats
Label LBL
The beginning of a program section repeat is marked by the label LBL.
The end of a program section repeat is identified by CALL LBL /REP.
Operating sequence
1 The TNC executes the part program up to the end of the program
section (CALL LBL /REP).
2 Then the program section between the called LBL and the label
call is repeated the number of times entered after REP.
3 The TNC then resumes the part program after the last repetition.
Programming notes
n You can repeat a program section up to 65 534 times in succession.
n The number behind the slash after REP indicates the number of
repetitions remaining to be run.
n The TNC always executes the program section once more than the
programmed number of repeats.
Programming a program section repeat
U
UU
U To mark the beginning, press the LBL SET key and
enter a LABEL NUMBER for the program section you
wish to repeat.
U
UU
U Enter the program section.
Calling a program section repeat
U
UU
U Press the LBL CALL key and enter the label number of
the program section you want to repeat as well as the
number of repeats (with Repeat REP).
0 BEGIN PGM ...
LBL1
CALL LBL1 REP 2/2
END PGM ...
Page view 391
1 2 ... 387 388 389 390 391 392 393 394 395 396 397 ... 529 530

Comments to this Manuals

No comments